Pouring Concrete vs Pouring Rain. ... If the rain occurs when the concrete is fresh (about 2-4 hours after mixing), the surface should be protected from the rain. If the finishing process was recently completed, rainwater may not cause damage as long as it is not worked into the surface and the slab is left untouched.Aug 24, 2012
2023-06-03 11:01:32

Ava Patel

QuesHub.com delivers expert answers and knowledge to you.
Pouring Concrete vs Pouring Rain. ... If the rain occurs when the concrete is fresh (about 2-4 hours after mixing), the surface should be protected from the rain. If the finishing process was recently completed, rainwater may not cause damage as long as it is not worked into the surface and the slab is left untouched.Aug 24, 2012
ask:3,asku:1,askr:137,askz:21,askd:152,RedisW:0askR:3,askD:0 mz:hit,askU:0,askT:0askA:4